Service Alerts!
 
Bridge Top Img-1

Bridge Design

In 1921, Joseph B. Strauss hired Charles A. Ellis to head up his staff and soon advanced him to Vice President, Strauss Engineering Corporation, in charge of bridge design and construction supervision. In 1925, Strauss had Ellis arrange for Prof. George F. Swain of Harvard University and Leon Moisseiff who designed New York’s Manhattan Bridge to serve on a Board of Consultants for the project.

Both men reviewed Strauss’s original plans for a symmetrical cantilever-suspension hybrid bridge and found them to be practical from an engineering standpoint and capable of being built. In November 1925, Moisseiff expressed concern about the hybrid design and submitted to Strauss his Report on Comparative Design of a Stiffened Suspension Bridge over the Golden Gate Strait at San Francisco, CA, which describes a design contrasting from the cantilever-suspension hybrid bridge design—a suspension span design.

The suspension span concept did not immediately become the leading design for the bridge as Strauss continued to campaign for a bridge using his original symmetrical cantilever-suspension hybrid design as late as 1929.

On August 15, 1929, the Board appointed prominent engineers Moisseiff, O.H. Ammann, and University of California, Engineering School, Berkeley, CA, Professor Charles Derleth, Jr., to serve as the Advisory Board of Engineers, alongside Chief Engineer Strauss. Strauss also appointed Ellis to work with the Advisory Board of Engineers, serving as its Secretary.

The timing of the change from the original Strauss proposal to a suspension bridge design is not precisely known, but it was accomplished sometime between the release of Moisseiff’s November 1925 report and the first meeting of the Advisory Board of Engineers on August 27, 1929. Further, The Golden Gate Bridge, Report of the Chief Engineer, September 1937, by Strauss, provides no details on the transition from his originally proposed symmetrical cantilever-suspension hybrid bridge to the Moisseiff-inspired suspension span design that was eventually built, and simply states, “... In the interval which had elapsed any advantages possessed by the cantilever-suspension type bridge had practically disappeared and on recommendation of the Chief Engineer, the cantilever-suspension type was abandoned in favor of the simple suspension type.”

On March 1, 1930, with final design underway and after overseeing test borings at the construction site, Ellis returned to Chicago to work on refining the design and estimates, while continuing to consult with Advisory Board of Engineers members Moisseiff and Ammann.

Ellis was responsible for directing the thousands of calculations required, for the computation of stresses, the preparation of stress sheets, as well as the development of the specifications, contracts and proposal forms. He worked tirelessly until December 5, 1931, when Strauss insisted he take a vacation. Three days before his vacation was over, Ellis received a letter from Strauss instructing him to turn all his work over to his assistant Clarahan, and to take an indefinite unpaid vacation.

For reasons still not clear today, Strauss fired Ellis. Ellis had lost his place in the history receiving no credit for his critical role in the design of the landmark Bridge. He went on to join the engineering faculty at Purdue University in 1934, from where he retired as Professor Emeritus of the Division of Structural Engineering in 1947. He passed away on August 29, 1949. 

Close
Top of Page